Quick report
- Cracking
- widespread
Dug pit at 6400ft WSW aspect, bottom of Pan Face. 45cm HST on MFcr. CTE 5 Q1 at 20cm on grauple CTE 8 Q1 at 35cm on grauple(after removing first failure layer). ECTN 12 at 20cm (propagated half way across column). Perhaps noteable full column planar fracture at 35cm on grauple while levering ECT column with shovel after test.